Request a quote
Practical guide

Land registry fees: how much to plan for a title reconciliation, a co-ownership or a land division

Before filing a technical file, you need to plan for the fees the ANCFCC charges to update the land title or create the new titles. Their amount depends on the operation, the value of the property and the number of titles. Here is how they are calculated.

Updated on 14/11/2026

Estimate my fees with the simulator

Your situation

  • Your building is complete and you are preparing the co-ownership file to sell the apartments one by one.
  • You have built or extended a villa, and the land title must describe the construction.
  • You are dividing a plot to sell or donate part of it.
  • A buyer, or their bank, asks what it will cost to bring the land title up to date.

In each case, the surveying engineer prepares the technical file, then the land registry charges fees to update the land title or create the new titles. Their amount is set by decree.

The official fee schedule

The fees are set by Decree No. 2-16-375 of 18 July 2016 setting the schedule of land registry fees, as amended (Chapter III, topographic operations).

OperationFees charged
Title reconciliation (construction, extension or plantation)1% of the value + 100 MAD fixed fee, minimum 1,000 MAD
Co-ownership: filing of the rules (plan by a surveying engineer)100 MAD per private unit
Co-ownership: title of each unit1.5% of the value + 200 MAD duplicate + 100 MAD fixed fee, minimum 800 MAD; 1.5% transfer fee in case of sale
Land division (plan by a surveying engineer)1.5% of the value + 50 MAD per are (urban) or per hectare (rural) + 200 MAD duplicate + 100 MAD per title, minimum 800 MAD; 1.5% transfer fee where applicable
Land division with a field operation and a plan by the ANCFCC2% of the value, same fixed and area fees, minimum 1,000 MAD

On what value?

For land registration, land division, subdivision, co-ownership and title reconciliation, the fees are calculated on the market value of the property on the date they fall due. The ANCFCC sets it on the basis of the average prices prevailing in the area, and may revise it when it does not match local prices (Decree No. 2-13-18 on land registration procedures, Article 30).

It is therefore neither the construction cost nor a price freely declared by the owner. The exact value is only known when the technical file is filed; before that, it can only be estimated.

For the area fee, the actual area is used, always rounded up to the next are in urban municipalities and to the next hectare elsewhere (same decree, Article 31).

A worked example

A new building comprises 2 shops of 60 m², 2 offices of 65 m² and 8 apartments of 95 m². In the neighbourhood, prices of 15,000 MAD/m² for shops, 11,000 MAD/m² for offices and 9,000 MAD/m² for apartments are used; the built area declared for the title reconciliation is 600 m².

ItemAmount
Title reconciliation: 1% of 5,400,000 MAD + 100 MAD54,100 MAD
Filing of the rules: 100 MAD × 12 units1,200 MAD
Unit titles: 1.5% of 10,070,000 MAD151,050 MAD
Duplicates: 200 MAD × 122,400 MAD
Fixed fees: 100 MAD × 121,200 MAD
Estimated total209,950 MAD

These prices are for illustration only: the land registry will apply its own area values. The simulator repeats this calculation with your areas and prices.

What the fees do not include

  • the surveying engineer’s fees for the technical file (survey, plans, reports);
  • the notary’s or adouls’ costs where deeds are required;
  • registration duties and signature certification costs.

Points to watch

  • The fees remain with the ANCFCC whatever the outcome of the formality (Decree No. 2-16-375, Article 2).
  • Co-ownership requires an up-to-date title: if the title reconciliation has not been done, it is filed together with the co-ownership and its fees are added.
  • Small units: for a cellar or a parking space with its own title, the minimum charge may exceed the proportional fee.
  • Mortgaged title: the creditor bank’s consent is required to issue the titles of the private units.

Frequently asked questions

Does the simulator give the exact amount?

No. It applies the official fee schedule to your areas and prices; the land registry sets the value after the technical file is filed, based on the prices prevailing in the area.

Are the fees refunded if the formality is not completed?

No: they remain with the ANCFCC whatever the outcome of the formality (Decree No. 2-16-375, Article 2).

Are the surveying engineer’s fees included?

No. The land registry fees come on top of the fees for the technical file, the cost of deeds and registration duties.

Is a title reconciliation needed before the co-ownership?

Yes, if the title does not yet describe the completed building. It is then filed together with the co-ownership, and its fees are added.