Request a quote
Practical guide

Scan to BIM: capturing an existing building up to its 3D model

Renovating a factory, rehabilitating an old building, managing a property portfolio: without reliable plans, every decision rests on assumptions. The laser scanner captures the existing building as millions of measured points, from which plans, sections and the digital model are produced.

Updated on 24/10/2026

From the point cloud to the digital model of the building
From the point cloud to the digital model of the building

Your situation

  • A renovation or extension project concerns a building whose plans are lost or wrong.
  • An industrial site must integrate new equipment without clashing with the existing installations.
  • A project owner wants a BIM model of its property portfolio to operate and maintain it.
  • A construction site must be checked against the design.

The principle

From each station, or while moving (mobile LiDAR), the laser scanner measures the position of millions of points on the visible surfaces. Once registered together and tied to the project coordinate system, these points form a 3D point cloud, on which the plans are then drawn or the model is built.

Plan view of a LiDAR point cloud of an industrial site
Plan view of a LiDAR point cloud of an industrial site

How it proceeds

  1. Definition of the need: areas to be covered, level of detail of the model, expected deliverables.
  2. Control points set out and surveyed in Lambert Morocco coordinates (Merchich datum) and NGM heights (Morocco's national levelling datum), to georeference the cloud.
  3. Acquisition: terrestrial scanner stations, mobile LiDAR runs, and drone for the roofs if needed.
  4. Registration and check: the acquisitions are registered to one another; the deviations on the control points are checked before any use.
  5. Processing: floor plans, sections, elevations, then modelling.
  6. Quality control of the model by overlaying it on the cloud.

The deliverables

  • the registered and georeferenced point cloud (E57 or RCP formats);
  • floor plans, sections and elevations in DWG;
  • the 3D or BIM model at the agreed level of detail (native format and IFC).
3D model of a villa produced from a survey
3D model of a villa produced from a survey

Points to define from the outset

  • the level of detail: walls and slabs only, or also joinery, building services and equipment;
  • the coordinate system: local to the building, or tied to the Lambert system and the NGM to fit into a project;
  • inaccessible areas: false ceilings, shafts, roofs, which require additional means.

Frequently asked questions

Does activity have to stop during the scan?

Generally not: the acquisitions are organised by zone, avoiding periods of heavy traffic.

Is the point cloud enough?

It contains the information, but most users need usable plans or a model; that is the purpose of the modelling stage.

Can the accuracy be checked?

Yes: independently surveyed control points make it possible to measure the deviations of the registered cloud.

Other useful guides

Written by the surveying engineers of DATUM ENGINEERING, a firm registered on the roll of the ONIGT (National Order of Surveying Engineers).

General information article, based on the standards of the ONIGT (National Order of Surveying Engineers) and the ANCFCC (National Agency for Land Registry, Cadastre and Cartography) and on the texts in force on the date of update. It does not replace an examination of your file.