For whom
- Public or private developers and subdividers.
- Roads and utilities (VRD) contractors.
- Owners of land to be divided into building plots.
The steps
- Survey control. Traverse and levelling benchmarks (Standard 09 of the ONIGT, the National Order of Surveying Engineers).
- Land base. Boundaries defined from the title, alignment check.
- Setting-out. Corners of plots or blocks, road centrelines, manholes.
- Monitoring of the works. Trench bottoms, kerbs, iron plot-corner markers.
- As-built survey and acceptance. Plan of the completed works compared with the authorised plan.
- Cadastral file. Subdivision filed and the title split into one title per plot.
Examples of assignments
- Residential subdivision
- Industrial subdivision
- Housing group: blocks and threshold levels
- Splitting of the parent title
What you receive
- Setting-out sheets
- Staking procès-verbaux (official reports)
- As-built plan
- Technical subdivision file
Reference framework
- Law 25-90
- ONIGT Standards 07, 08, 09 and 10
Where we work
The firm is based in Aïn Sebaâ and works in the sixteen districts of Casablanca (Anfa, Maârif, Sidi Belyout, Al Fida, Mers Sultan, Aïn Chock, Hay Hassani, Ben M'Sick, Sbata, Moulay Rachid, Sidi Othmane, Hay Mohammadi, Roches Noires, Aïn Sebaâ, Sidi Bernoussi, Sidi Moumen), in Mohammedia, Bouskoura, Dar Bouazza, Nouaceur, Médiouna, Berrechid, Benslimane, Settat and El Jadida.
Projects of the firm
- Cadastral matters: technical filesFiles for land registration, title reconciliation, co-ownership, subdivision, land division and merger.
Further reading
Frequently asked questions
When should the surveyor be brought in?
As soon as the land is purchased: the topographic plan and the land base determine the design.
When is one title per plot obtained?
After acceptance and filing of the subdivision file with the Cadastre.