For whom
- Contractors (contractor's surveyor).
- Project owners (checking surveyor).
Our work
- Traverse. Acceptance of the base traverse.
- Before concreting. Check of the position of the structural grid lines, certificate.
- Threshold levels. Sheet checking the deviations between design and survey.
- Verticality. Targets surveyed periodically for buildings above ground floor plus nine storeys.
- Earthworks. Platforms and embankments checked, regular progress reports.
Examples of assignments
- Check before concreting
- Survey crew on a large site
- Verticality check of a tower
What you receive
- Certificates and check sheets
- Progress reports and reports
- Control plans
Reference framework
- ONIGT (National Order of Surveying Engineers) Standard 10 (monitoring of construction works)
- Law 66-12
Where we work
Based in Casablanca (Aïn Sebaâ), the firm carries out this service throughout Morocco: Greater Casablanca, Rabat-Salé-Témara, Fès, Tangier, Agadir, the Oriental and the South. Its survey crews travel to the site for the duration of the assignment.
Projects of the firm
- Topographic control of earthworksTopographic control of the earthworks of a major facility: survey crew on site, checks and regular reports.
- Topographic monitoring of a quarry roadDaily topographic monitoring of the construction of a quarry access road: setting-out, profiles and checks.
Frequently asked questions
Who checks the contractor's setting-out?
The project owner's surveyor, by means of a check sheet or a procès-verbal (official report) (Standard 10).
Can monitoring be permanent?
Yes, a survey crew can be assigned to the site.