When it applies
- Start of a villa or an apartment building.
- Housing group: block corners.
- Industrial building with a steel frame.
Our work
- Fitting. Grid line plan fitted to the authorised plan and the land base.
- Setting-out. Block corners before earthworks, then grid lines.
- Levels. At least two levelling benchmarks and threshold levels.
- Sheet. Setting-out sheet handed to the contractor.
Examples of assignments
- Villa
- Apartment building
- Block corners of a housing group
- Footings and steel columns
What you receive
- Setting-out sheet
- Fitted grid line plan
- Levelling benchmarks
Reference framework
- ONIGT (National Order of Surveying Engineers) Standard 07 (setting-out)
- ONIGT Standard 09
Where we work
Based in Casablanca (Aïn Sebaâ), the firm carries out this service throughout Morocco: Greater Casablanca, Rabat-Salé-Témara, Fès, Tangier, Agadir, the Oriental and the South. Its survey crews travel to the site for the duration of the assignment.
Projects of the firm
- Industrial building setting-out and monitoringInitial and final topographic plans, setting-out of axes and steel frame, and earthworks volumes for a building.
Further reading
Frequently asked questions
Is a topographic plan needed before setting-out?
Yes: it fixes the boundaries and the levels of the natural ground.